Meeting the need to control odor while maintaining access to a pre-aeration basin, the Grand Strand Water and Sewer Authority of South Carolina needed a cover for its pre-aeration basins. Because of the plant's proximity to homes and a golf course, odor control was a primary concern.
Stamina to outlast Kentucky's extreme weather was a fundamental requirement of the liner selected for this pond.
A 35-acre raw water reservoir at the Franklin Water Treatment Plant in Tennessee uses XR-3PW and XR-5PW to line its basin.
XR Geomembranes XR-5® able to withstand Florida's extreme weather at Cape Canaveral Air Force Base.
U.S. Department of Interior chooses XR-5 geomembrane for wastewater impoundment needs.
The extreme, bone-chilling temperatures in Alaska are some of the most demanding conditions possible for a primary containment liner.