XR-3, based on XR technology utilizing EIA (Ethylene Interpolymer Alloy), was chosen to reline a 7.5 acre wastewater pond for its long-term performance in wastewater facilities.
Major tank training and readiness facility chooses XR-5 to line the holding pond at their vehicle wash facility.
City of North Augusta chooses XR-3 PW for potable water needs.
The Cypress Copperstone Mine on the California-Arizona border uses XR-5 geomembranes for their mining needs.
Sante Fe Pacific Gold uses over 1 million square feet of XR-5 to minimize heat build-up for employees.
A 90' diameter vertical gasoline storage tank was lined with Seaman Corporation Polyurethane, a liner that is resistant to gasoline.
The largest floating cover in the world is made of the XR-5® Geomembrane.
6,000 square feet of 8130 XR-5 geomembrane is used to line the deicing chemical runoff pond at Lansing Regional Airport.
Distillery chooses to treat wastewater using aerobic treatment in XR-5 lined ponds.